My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 06-18-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
06/18/2001
>
6.4. SR 06-18-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:34 AM
Creation date
5/7/2003 8:51:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Explosives: <br /> <br />There are no explosives used at this site. <br /> <br />Fugitive Dust: <br /> <br />Fugitive dust is minimized by hard-surfaced roads access road <br />and use of conveyors. Internal haul roads are watered as <br />needed. Asphalt plant operation and fugitive dust will not <br />exceed air pollution standards established by the Minnesota <br />Pollution Control Agency. <br /> <br />Water Pollution: <br /> <br />The site will be operated in compliance with all applicable <br />Minnesota Pollution Control Agency and Department of Natural <br />Resources standards. The asphalt plant will not discharge <br />wastewater. A National Pollution Discharge Elimination Permit <br />(NPDES) has been obtained for the site. Fuel is stored in above <br />ground tanks. Secondary containment is provided for all fuel <br />tanks. <br /> <br />Topsoil: <br /> <br />All topsoil will be retained on the site until the completion of <br />restoration. Topsoil has been used to create screening berms <br />and these berms will subsequently be removed as part of the <br />reclamation process. <br /> <br />g. Slopes: <br /> <br />The active mining face will be sloped at approximately 1' 1. <br />Reclaimed slopes will be backfilled to a maximum slope of 4:1 <br /> <br />6.) Reclamation Standards <br /> <br />a. Schedule: <br /> <br />Reclamation will occur as portions of the site reach final <br />elevations. Some areas on the base of the floor may be used <br />for stockpiling or operations and will be reclaimed as operations <br />permit. <br /> <br />15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.