Laserfiche WebLink
3.) <br /> <br />Mining shall not be conducted within 5 feet of a right-of-way of an <br />existing public utility. <br /> <br />221st Ave. runs through a portion of the property. It is anticipated <br />that this road will be lowered in the future as mining progresses. The <br />setbacks from the right-of way would be mined in conjunction with the <br />lowering of the road. The lowering of 221st Ave. will be subject to <br />review and approval by the City and MnDOT. <br /> <br />Fencing: <br /> <br />Perimeter areas are fenced to prevent unauthorized access. Additional <br />fencing will be installed as a result of adding mining area. <br /> <br />4.) <br /> <br />5.) <br /> <br />Appearance and Screening: <br /> <br />All equipment will be kept operational. Abandoned equipment and <br />rubbish will be periodically removed from the site. Within 3 months <br />after termination of mining, or within 3 months after termination of the <br />extraction license, all buildings and structures incidental to extraction <br />operations will be removed. The site will be graded in accordance <br />with the reclamation plan. <br /> <br />The perimeter of the site will be screened along US 169, north of <br />221st Ave. A berm has been constructed, seeded, and maintained. <br /> <br />Operating Standards: <br /> <br />a. Noise: <br /> <br />The mining operation and asphalt plant will be operated in <br />compliance with all State noise standards. <br /> <br />b. Hours: <br /> <br />Mining and crushing will be conducted between 7 a.m. to 7 <br />p.m. Monday - Saturday. The asphalt plant will operate <br />Monday- Saturday in accordance with its current permit. The <br />asphalt plant may need to operate extended hours to provide <br />material for nighttime paving operations. <br /> <br />14 <br /> <br /> <br />