My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 06-18-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
06/18/2001
>
4.3. SR 06-18-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:33 AM
Creation date
5/7/2003 8:38:29 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r~raft Status Report on the Northstar Commuter Rail Project. June 7, 2001 <br /> <br />operations. <br /> <br />The Chapters include: <br />1. Project Overview <br />2. Project Organization <br />3. Financial Requirements <br />4. Quality Management Plan <br />5. Final Design Program <br />6. Construction Managements Plan <br />7. Testing and Start-up Program <br />8. Program Management and Control <br />9. Procurement <br />10. Real Estate Acquisition Program <br />11. Human Resources and Labor Relations <br />12. Risk Management and Insurance <br />13. System Safety and Security <br />14. Communications and Public Involvement <br />15. Legal Requirements and Agreements <br />16. Fleet Management Plan <br /> <br />VOLUME V CAPITAL COST ESTIMATE <br />Provides current (2001) and year of construction (End of <br />2004) capital cost estimates for the Northstar Project. <br />Estimates are provided in both summary and detail. <br />Year 2001 costs are inflated for 3.5 years to end of 2004 <br />at a rate of 3.75 percent per year. The estimate includes <br />engineering and contract administration costs of 20 <br />percent and contingency allowances of 15 percent. The <br />total capital cost estimate for the Northstar Commuter <br />Rail project is $260,693,800 (2004 Dollars). <br /> <br />VOLUME VI MINIMAL OPERABLE SEGMENT (MOS) <br />As requested by FTA, the project was divided into shorter <br />segments and analyzed for cost impacts. The segments <br />reviewed include Minneapolis to Elk River with <br />incremental additions of Big Lake, East St. cloud, and <br />finally the full project at Rice. <br /> <br />The segments are reviewed for the incremental change <br />in capital cost, operating cost, and ridership to determine <br />an annualized cost per rail rider and a cost effectiveness <br />indicator for the initial segment to Elk River, and for each <br />subsequently longer section. <br /> <br />Northstar Corridor Development Authority 27 <br /> <br /> <br />