Laserfiche WebLink
of ~ TO: MAYOR & CITY COUNCIL <br />i <br />~k Rlver FROM: PHIL HALS, STREET/PARK SUPT <br />DATE: JANUARY 20, 1994 <br />SUBJECT: WOODLAND TRAILS CONSTRUCTION <br />SCHEDULE <br />The archaeological study of Woodland Trails Park was completed <br />in November, 1993 without finding any historical or <br />archaeological sites in the proposed construction area. This <br />means that we can proceed with the entrance road, parking lot, <br />and trails in 1994. <br />I would propose the following construction schedule for 1994: <br />1. Rough grade the. entrance road and parking lot with a <br />rental dozer. <br />2. Level subgrade and install 1700 ton of Class 5 base with <br />City equipment. <br />3. Plow in electrical wire and set bases for 12 street lights <br />with City equipment. <br />• <br />4. Grade crushed rock trails and install 1300 ton of crushed <br />rock delivered by others, installed by City equipment. <br />5. Grade bituminous trails and install 2500 ton of Class 5 <br />base with City equipment. <br />1995 Schedule <br />1. Fine grade and pave the 86DD lineal feet of trails with <br />1300 ton of bituminous with City equipment. <br />2. Install 12 street light fixtures. <br />3. Fine grade and pave the entrance road and parking lot with <br />1000 ton of bituminous with City equipment. <br />This schedule is based on the assumption that Woodland Trails <br />Park will be the major construction project for 1994 and 1995. <br />As you will note from the quantities, this project will take <br />many hours of Street/Park department time to complete. <br />• <br />P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />