My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10. SR 06-19-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
06-19-1995
>
5.10. SR 06-19-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2009 11:23:45 AM
Creation date
11/30/2009 11:23:45 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/19/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of ~ TO: MAYOR & CITY COUNCIL <br />i <br />~k Rlver FROM: PHIL HALS, STREET/PARK SUPT <br />DATE: JANUARY 20, 1994 <br />SUBJECT: WOODLAND TRAILS CONSTRUCTION <br />SCHEDULE <br />The archaeological study of Woodland Trails Park was completed <br />in November, 1993 without finding any historical or <br />archaeological sites in the proposed construction area. This <br />means that we can proceed with the entrance road, parking lot, <br />and trails in 1994. <br />I would propose the following construction schedule for 1994: <br />1. Rough grade the. entrance road and parking lot with a <br />rental dozer. <br />2. Level subgrade and install 1700 ton of Class 5 base with <br />City equipment. <br />3. Plow in electrical wire and set bases for 12 street lights <br />with City equipment. <br />• <br />4. Grade crushed rock trails and install 1300 ton of crushed <br />rock delivered by others, installed by City equipment. <br />5. Grade bituminous trails and install 2500 ton of Class 5 <br />base with City equipment. <br />1995 Schedule <br />1. Fine grade and pave the 86DD lineal feet of trails with <br />1300 ton of bituminous with City equipment. <br />2. Install 12 street light fixtures. <br />3. Fine grade and pave the entrance road and parking lot with <br />1000 ton of bituminous with City equipment. <br />This schedule is based on the assumption that Woodland Trails <br />Park will be the major construction project for 1994 and 1995. <br />As you will note from the quantities, this project will take <br />many hours of Street/Park department time to complete. <br />• <br />P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.