My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4. SPSR 11-03-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2009
>
11-03-2009
>
4. SPSR 11-03-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2009 9:39:44 AM
Creation date
11/2/2009 9:39:44 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final uses of this property will depend on end-use plans that are yet to be <br />determined. Currently, the property within the City of Elk River is <br />designated as Commercial Reserve Transition. In all likelihood, much of <br />this property will be suitable to be developed as both residential and light <br />commercial as mining ceases. <br />e. Is this project a subsequent stage of an earlier project? _Yes X No <br />If yes, briefly describe the past development, timeline and any past <br />environmental review. <br />7. Project Magnitude Data <br />Total project acreage: 62.9 acres <br />Number of residential units: unattached 0 attached 0 maximum units per <br />building 0 <br />Commercial, industrial or institutional building area (gross floor space): 12,000 sQ. <br />ft. <br />Indicate areas of specific uses (in square feet): <br />Office 1,000 Manufacturing 0 <br />Retail 0 Other industrial 0 <br />Warehouse 0 Institutional 0 <br />Light industrial 0 Agricultural 0 <br />Other commercial (specify) 0 <br />Building height If over 2 stories, compare to heights of nearby buildings: n/a <br />8. Permits and approvals required <br />List all known local, state and federal permits, approvals and financial assistance for the <br />project. Include modifications of any existing permits, governmental review of plans and <br />all direct and indirect forms of public financial assistance including bond guarantees, Tax <br />Increment Financing and infrastructure. All of these final decisions are prohibited until <br />all appropriate environmental review has been completed. See Minnesota Rules, Chapter <br />4410.3100. <br />Table 8.1 Permits and <br />Annrovals Required <br />Unit of Government T e of A lication Status <br />MPCA NPDES Storm Water Permit To Be Obtained <br />MPCA Air Permit To Be Obtained <br />MN DNR Water A ro riation To Be Obtained <br />Cit of Elk River Minin Permit To Be Obtained <br /> <br />Cit of Elk River Re-zone Property as Mining <br />District <br />To Be A lied For <br />Cit of Elk River Conditional Use Permit To Be A lied For <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.