My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4. SPSR 11-03-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2009
>
11-03-2009
>
4. SPSR 11-03-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2009 9:39:44 AM
Creation date
11/2/2009 9:39:44 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4410.4300 Subpart 12 (B) Development of a facility for the extraction or mining of <br />sand, gravel, stone, or other nonmetallic minerals, other than peat, which will excavate <br />40 or more acres of land to a mean depth often feet or more during its existence, local <br />governmental unit. <br />5. Project Location <br />County: Sherburne <br />City /Township: Elk River / Livonia <br />Parcel 2: <br />The Southeast Quarter of the Northeast Quarter (SE'/4 of NE 1/4), lying West of Baldwin <br />Street, in Township Thirty-three (33) North, of Range Twenty-six (26) West, Sherburne <br />County, Minnesota; <br />Parcel 7: <br />Southwest Quarter of the Northeast Quarter (SW t/4 of NE '/4) lying Northwesterly of the <br />centerline of Baldwin Street and that part of the Southeast Quarter of the Northwest <br />Quarter, lying Easterly of the Easterly line of Trunk Highway 169 (formerly known as <br />Minnesota State Highway 18 or Elk River and Princeton Wagon Road or Princeton <br />Road), all in Section 3, Township 33, Range 26, Sherburne County, Minnesota. <br />1. Description <br />a. Provide a project summary of 50 words or less to be published in the <br />EQB Monitor. <br />Gemstone Products Company proposes to operate a sand and gravel mine <br />along with an aggregate crushing and washing plant to provide <br />construction aggregates for the north metro market. The facility will be <br />located in the city of Elk River on the east side of TH 169, at 225tH <br />Avenue. <br />b. Give a complete description of the proposed project and related new <br />construction. Attach additional sheets as necessary. Emphasize <br />construction, operation methods and features that will cause physical <br />manipulation of the environment or will produce wastes. Include <br />modifications to existing equipment or industrial processes and <br />significant demolition, removal or remodeling of existing structures. <br />Indicate the timing and duration of construction activities. <br />Gemstone is proposing to open a new aggregate mine. Mining operations <br />and practices on the property are proposed to be similar to current <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.