My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 08-17-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
08-17-2009
>
5.6. SR 08-17-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2009 9:38:14 AM
Creation date
8/14/2009 9:38:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/17/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL -FAST Phase II, Elk River, MN <br />August 12, 2009 <br />Page 3 of 4 <br />identify the magnitude of development potential for each concept alternative as a way to <br />compare and contrast them. <br />3.4 Facilitate review session with City staff at HKGi office to evaluate concepts. <br />3.5 Revise concepts based on meeting feedback. <br />3.6 Facilitate concept review session with EDA/PC/CC for review and feedback. <br />3.7 Revise concepts based on meeting feedback. <br />3.8 Update project website and prepare project newsletter illustrating concept alternatives. <br />3.9 Facilitate public open house to provide an opportunity for the community to offer feedback <br />on the concepts prior to refinement into a single alternative. <br />3.10 Prepare summary of community feedback. <br />Deliverables: <br />^ Meeting and open house agendas/summaries <br />^ Preliminary concepts <br />^ Development yield technical memo <br />^ Project newsletter <br />Task 4-Prepare Preferred Plan for the Full FAST Study Area <br />4.1 Conduct meeting with City staff to review public input and identify recommendation for <br />refining concepts into a single, preferred plan. <br />4.2 Facilitate EDA/PC/CC work session to review public input and recommendations for plan <br />refinement. <br />4.3 Based on EDA/PC/CC input, prepare a preferred plan for the full study area. Like the <br />concept alternatives, the preferred plan will be designed and graphically illustrated around: <br />• Development patterns <br />• Transportation systems <br />• Crreen infrastructure <br />4.4 Update development "yield" for the preferred plan. <br />4.5 Assist City staff in preparing a utility and infrastructure impact analysis for the preferred <br />plan. <br />4.6 Prepare draft report that incorporates both FAST phases I & II. <br />4.7 Facilitate review session with City staff. <br />4.8 Facilitate final review workshop with EDA/PC/CC to present the full draft plan for <br />comment and recommendation for approval. <br />4.9 Refine draft plan based on feedback and submit a final plan. <br />4.10 Present plan to City Council for comment and approval. <br />4.11 Make final modifications as necessary. <br />Deliverables: <br />^ Preferred plan and support graphics for full study area <br />^ 3 bound report copies and CD of report at draft and final stages <br />^ CAD version of master plan <br />^ Meeting agendas/summaries <br />Fee Proposal <br />HKGi proposes to conduct the work outlined above at an hourly rate for a fee not to exceed $39,600 <br />including reimbursable expenses. HKGi is prepared to start the project immediately with an anticipated <br />five month timeframe to completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.