My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 07-20-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
07-20-2009
>
7.1. SR 07-20-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2009 3:41:54 PM
Creation date
7/17/2009 3:41:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />Ci Council 7.1. <br />Agenda Section Meeting Date Prepared by <br />Public Works ul 20, 2009 Te Maurer, Public Works Director <br />Item Description Reviewed by <br />Norfolk, Morton, Lowell, King Avenues Area Street <br />Improvement -Public Hearing/Assessment Hearing Reviewed by <br />Action Requested <br />The City Council is requested to conduct a public hearing/assessment hearing for the Norfolk, <br />Morton, Lowell, King Avenues Area Street Improvement Project. After the hearings are closed, <br />the Council is requested to consider adoption of the attached three resolutions: The first, <br />Ordering the Improvement (requires 4/5 vote of the Council); the second, Adopting the <br />Assessment Roll; and the third, Accepting the Bid and Authorizing Execution of the Contract. <br />Background/Discussion <br />After an informational hearing was held on Apri122, 2009 with the affected property owners, the <br />City Council authorized preparation of plans and specs and bidding the project on July 7, 2009, <br />anticipating this evening's public hearing/assessment hearing. There were a total of seven bids <br />received. Following is a list of bidders and their total bids. The complete bid tabulation is <br />attached. <br />Compan Name Bid Amount <br />Rum River Contractin $238,156.60 <br />North Valle ,Inc. $244,561.90 <br />Northwest As halt $258,510.25 <br />Hardrives, Inc. $266,821.90 <br />W.B. Miller, Inc. $280,731.36 <br />G.M.H. As halt Co oration $281,597.20 <br />Knife River Inco orated ~ $303,175.08 <br />The feasibility for the project estimated the construction cost for street, storm sewer <br />improvements and some minor watermain improvements at $411,000. The low bid received <br />from Rum River Contracting is approximately 40 percent under the feasibility estimate. At the <br />close of the public hearing/assessment hearing and the passage of the resolution ordering the <br />improvement and the resolution adopting the assessment roll, we will be prepared to recommend <br />the award of the contract to Rum River Contracting as the lowest responsible bidder. <br />At Monday evening's meeting, the public hearing/assessment hearing for the project is scheduled, <br />I will be prepared with a presentation that will briefly discuss the project, go through a cost <br />analysis, and discuss the assessment. Allowing a small percentage for contingency above the bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.