My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. - 7.11. SR 09-23-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
09/23/1996
>
7.2. - 7.11. SR 09-23-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:28 AM
Creation date
5/2/2003 8:26:11 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Item 7.7. - Bauerly Brothers, Inc., is planning to start the overlay prep work <br />on September 23 with paving to start soon after. I would expect to see the <br />project completed within the next two weeks. <br /> <br />Item 7.8. - The 1996 overlay budget has gone for two contracted overlays, <br />225th from County Road 32 to Big Lake Township for $4,700, and the milling <br />and repaves of Main Street at Evans Avenue for $9,000. Some of our city laid <br />paver patches may be drawn from that fund. Paver patches have been laid in <br />Riverview Heights, Hobbit Hills, Deerfield 3, 193rd Avenue west of Proctor, <br />Baldwin and 3rd, and a number of small areas. <br /> <br />Item 7.9. - 217th Avenue east of County Road 1 has long been considered for <br />improvement, but the lack of sufficient right-of-way has limited our <br />improvements to just road grading. Once the city has acquired the right-of- <br />way, I would propose to regrade the road to a rural section with a 24 foot <br />wide top, shallow "V" bottom ditches, and a 6 inch thick Class 5 surface. <br />These improvements could be done with city staff and equipment with the <br />only out-of-pocket costs being the Class 5 aggregate which would be paid for <br />with maintenance funds and be completed this fall. <br /> <br />Item 7.10. - I will have project costs available for handout on Monday night. <br /> <br />Item 7.11. - I will have a quote available for the striping costs for Highland <br />Road at Monday's meeting. I think it makes sense to contract this type of <br />striping rather than doing it in-house. <br />
The URL can be used to link to this page
Your browser does not support the video tag.