My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. & 5.4. PCSR 06-09-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
06-09-2009
>
5.3. & 5.4. PCSR 06-09-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 2:19:42 PM
Creation date
6/8/2009 3:58:40 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/9/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 <br />Conditional Use Permit for Sanitary Landfill <br />4.1 CONDITIONAL USE PERMIT NARRATIVE <br />The CUP application requires a narrative that provides the information below. <br />^ Detailed description/scope of project (what is being proposed) <br />See Section 1.2 for a complete description of the proposed project. <br />^ Hours of operation <br />The ERL will limit its operations to the hours of 6:00 a.m. to 7:00 p.m. Monday through Saturday, <br />excluding holidays. During that time, the landfill will be operated in accordance with the <br />operational requirements enforced by the MPCA permit. The landfill may accept waste during the <br />off hours only under the following circumstances: <br />- The wastes have been approved for disposal <br />- Acceptance of waste is necessary during off hours because of extraordinary <br />circumstances <br />- Each instance of off-hour acceptance will receive the prior approval of the City <br />Building and Zoning Administrator and such approval was granted during City <br />business hours <br />• Number of employees <br />The ERL employs approximately 14 people at the current landfill site. The landfill employee <br />numbers are not expected to increase with the development of the SDA. <br />^ Number of parking stalls (existing and additional) <br />The landfill employees park their vehicles at the sites' office building located on the north side of <br />the existing MSW landfill. There are 20 parking stalls located at the office building site as well as <br />ample room for parking in the yard area to the north of the building. No additional parking stalls <br />are proposed for the SDA. <br />^ Is there proposed screening of the site? <br />The proposed Landscape/Screening plan is presented in Section 1.2.4. The Landscape/Screening <br />Plan is shown in the drawings labeled L2.01, L2.02, and L5.01. Renderings of the <br />Landscape/Screening plan are presented in Exhibit 3. ERL intends to enhance the existing <br />screening plans to effectively screen views of the landfill from TH 169, 221St Avenue and the <br />City's Railroad Hiking Trail. <br />^ Proposed building materials <br /> <br />Elk River Landfill SDA ~ ~ 80112511'00 ~W2nCl< Section 4-1 <br />Land Use Application .,R„~..„~,,,,~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.