My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 05-18-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
05-18-2009
>
6.1. SR 05-18-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2009 2:00:13 PM
Creation date
5/15/2009 1:54:19 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sform Sewer <br />A review of the drainage patterns and pavement conditions reveal no significant storm <br />drainage issues exist. The inlet capacity at the low point on Angel Avenue just south of <br />Lookout Place has been reviewed as part of design and additional inlets added as <br />needed. <br />The storm sewer mains along Lowell Avenue and Morton Avenue will be televised to <br />determine if repairs are needed but no major replacement is anticipated <br />VI. CITY/MUNICIPAL UTILITIES COORDINATION <br />In previous reconstruction projects, groundwork was laid for cooperation between the <br />city and the municipal utilities. Similarly with this project it is agreed that the Municipal <br />Utilities will fund all of the construction costs associated with their water improvements. <br />In addition, the Municipal Utilities agreed to pay a percentage of construction cost for <br />plan and specification preparation. This percentage is proposed to be 10 percent of the <br />water improvement construction cost. Finally, the Municipal Utilities agreed to pay <br />directly for services during construction, including construction staking, construction <br />observation, contract administration and record drawing preparation. <br />VII. RIGHT-OF-WAY, EASEMENTS, AND PERMITS <br />Right-of-Way and Easements <br />No right-of-way will need to be acquired for the street improvements. <br />Temporary construction easements may be required throughout the project area to <br />accommodate driveway repair andlor finished grading related to sidewalk replacement. <br />Verbal permission will be secured from private property owners during the construction <br />process should work need to be completed on private property. <br />Permits <br />Several permits will be required prior to construction of the proposed improvements. <br />Required permits include, but are not limited to, the following: <br />• Minnesota Department of Health <br />• Minnesota Pollution Control Agency (NPDES) <br />Watermain <br />Grading/Storm Water Quality <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.