Laserfiche WebLink
CAPX 2020 <br />INTERIM REPORT <br />DECEMBER 2004 <br />Minnesotans will require access to new generation facilities to meet projected growth. They <br />will need a robust transmission system, one that can provide service reliably into the future, <br />to support the new generation facilities. To meet these needs, significant transmission line <br />upgrades and new transmission construction will be required over the next 15 years. CapX <br />2020 understands these needs and believes planning and construction must be done wisely, <br />serving the public interest through a deliberate process that includes all stakeholders. We <br />look forward to working with stakeholders to ensure these objectives are met. <br />CAPX 2020 VISION TEAM MEMBERS <br />Will Kaul <br />Vice President, Transmission <br />Great River Energy <br />Elk River, Minnesota <br />ww=w.~~reatriverener~o.cc~m <br />Tom Ferguson <br />Vice President, Power Delivery and Transmission <br />Minnesota Power <br />Duluth, Minnesota <br />~x-ww.n7n~ower.com <br />Raymond J. Wahle <br />Director, Power Supply and Operations <br />Missouri River Energy Services <br />Sioux Falls, South Dakota <br />www.mrencr~,-~~on~ <br />Rod Scheel <br />Vice President, Asset Management <br />Otter Tail Power Company <br />Fergus Falls, Minnesota <br />w-~~u.otpco.coi~~ <br />:- - <br />Doug Jaeger <br />Vice President, Transmission, Safety & Technical Training <br />and Don Jones <br />Director, Transmission Asset Management <br />Xcel Energy <br />Minneapolis, Minnesota <br />~~~-w.zcclener~~~n.corn <br />