My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. ERMUSR 01-11-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
01-11-2005
>
6.6. ERMUSR 01-11-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2009 3:37:35 PM
Creation date
4/6/2009 3:37:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPX 2020 <br />INTERIM REPORT <br />DECEMBER 2004 <br />Scenario System Intact <br />Overloads Prior Outage <br />Conditions4 Voltage <br />Violations <br />North/West Bias _ 42 142 45 <br />Minnesota Bias __ 42 __ <br />187 14 <br /> <br />Eastern Bias <br />42 _ <br />_ <br />197 ___ <br />33 <br />1-able 5 <br />The schedule for completing CapX 2020 Vision study is shown in Table 6. <br />Task 2004-2005 Schedule <br />Model Preparation 9/27 - 10/29 <br />Power Flow Analysis 11/1 - 12/17 <br />System Improvement Analysis 1/17 - 3/17 <br />Final Report May 2005 <br />1 able b <br />a Outages of individual facilities greater than 150 kilovolts were simulated. <br />5 Includes the addition of a 345 kilovolt facility from Canada to Minnesota. <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.