My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. ERMUSR 01-11-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
01-11-2005
>
6.6. ERMUSR 01-11-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2009 3:37:35 PM
Creation date
4/6/2009 3:37:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaPX 2020 <br />INTERIM REPORT <br />DECEMBER 2004 <br />ATTACHMENT F <br />PRELIMINARY RESULTS <br />The CapX 2020 technical team assumed that the generation modeled in the 2009 summer <br />model would exist in 2020 and would serve the load modeled in 2009. To address <br />anticipated load growth of 6,300 megawatts, the team solicited information from independent <br />power producers (including wind developers), resource planning entities within various <br />organizations, and the Midwest Independent Transmission System Operator's (MISO's) <br />generation interconnection queue. The team mapped the locations of these resources and <br />identified five generation regions: northern Minnesota, North Dakota and South Dakota, <br />southern Minnesota/northern Iowa, Wisconsin and the Twin Cities metropolitan area. These <br />are shown in Diagram 4. <br />Diagram 4 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.