My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. ERMUSR 06-12-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
06-12-2007
>
6.2. ERMUSR 06-12-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2009 10:25:17 AM
Creation date
3/23/2009 10:25:16 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Does utility Does utility <br />Does utility charge charge capitalize new Is the <br />developers or developers or Does utility construction capitalized <br />customers for residential charge infrastructure price minus <br />components that <br />make up primary customers <br />d commerciaU improvements the developers <br /> <br />di <br />ib secon <br />ary industrial during the current or customers <br />str <br />ution service from customers year of contribution or <br /> infrastructure If yes, what is charge transformer to If yes, what is charge for service If yes, what is charge construction Or total cost of the <br />City/Utility system based on the customer based on up rades~ based one other? prolect~ <br /> In developments, we <br /> use lot line metering. <br /> Meter to house is <br /> In new additions or customer <br /> newly platted areas responsibility. From <br /> not presently served trans to meter <br /> charge is for all customer pays <br /> material except material & labor over Yes, unless it is <br /> metering, all labor 8 $5,000. Non- construction in <br /> equipment over development areas - progress at 12/31 <br /> <br />55,000 unless a <br />underground is per ft , <br />then it is <br /> development charge, overhead is capitalized and <br /> agreement states flat rate for standard depreciated when Total cost of <br />Two Harbors Yes othervvise _ Yes drop. Yes Time and material complete project <br /> <br />Warroad <br />No <br />No <br />No Only over $5,000 <br /> <br />Actual costs. er circuit Total cost <br /> Commerical <br /> customers are <br /> reimbursed initial <br /> Yes for costs to provide <br /> commercial, No for primary distribution <br />Waseca residential and transformer No Yes Actual costs Current Year Total <br /> pay for wire for <br />Wells <br />\A/ 1. L No ___ Yes under round services No Yes Yes <br />total <br /> uunng the year as <br /> <br />Willmar No No <br />No project goes into <br /> service N/A <br /> No developer <br /> <br />Windom No No <br />No <br />Yes or customer <br />fee <br />customer pays for all <br />material on their <br />property if it's a <br />dedicated service and Customer pays for <br />benefits no other material on their <br />customers. Utility property. Utility Total cost of <br />Worthington Yes provides the labor. Yes provides the labor Yes Service size Yes project <br />
The URL can be used to link to this page
Your browser does not support the video tag.