Laserfiche WebLink
Does utility Does utility <br />Does utility charge charge capitalize new Is the <br />developers or developers or Does utility construction capitalized <br />customers for residential charge infrastructure price minus <br />components that customers commercial/ improvements the developers <br />make up primary secondary industrial during the current or customers <br />distribution service from customers year of contribution or <br /> infrastructure If yes, what is charge transformer to If yes, what is charge for service If yes, what is charge construction or total cost of the <br />City/Utility system based on the customer based on up rades~ based one others project <br /> Flat rate for <br /> residential:$200 <br /> overhead, $650 end of current total cost of <br />North St. Paul No _ Yes underground No year payment <br /> <br />Ortonville <br />No <br />No during current <br /> No ear NA <br /> Avg. cost. Customer Avg. cost. Customer <br /> pays about 60%. pays about 60%. <br /> Current charge is Current charge is capitalized upon <br /> $SDO, of which $125 is $500, of which $125 is completion of cost less <br />Owatonna Yes for service portion Yes for service portion No project contribution <br /> Developer <br /> doesn't <br /> <br />Preston <br />No <br />No <br />Yes <br />cost of upgrade <br />current year contribute to <br />costs <br /> If it is known <br /> that a cost will <br /> be directly <br /> billed to the <br /> developer, it <br /> will not be <br /> added to <br /> capitol costs. <br /> Otherwise total <br /> <br />Princeton <br />Yes <br />Yes <br />Yes <br />current ear cost is <br />ca italized <br />Randall No No Yes cost of up rade Burin the year total cost <br />Differential between customer may have to <br />what is assumed to be install a concrete <br />collected via retail transformer pad and <br />rates for new conduit to the <br />installations over designated point of Total cost of <br />assets lifetime and service. If customers capitalize the project <br />average cost of a wants this done after infrastructure the since GASB <br />residential service hours, they pay for all year it is placed in 34 came into <br />Rochester Yes installation No No labor and equipment service effect <br />200 amp - $250 for 200 amp - $250 for <br />single phase, 400 amp single phase, 400 amp <br />- $400 for single - $400 for single Cost of supplies + <br />Saint James Yes phase Yes phase Yes labor Yes Total cost <br />On 4-11-06 will start <br />new Electric Access <br />Charge of $12D0 to <br />offset some cost of <br />new installation. Cost <br />billed to property <br />owner when building <br />Saint Peter No permits are obtained <br />cost difference _ based on 100% cost <br />between underground less increased margin <br />system and overhead secondary services from sales due to <br />equivalent services to and owned and increased load with a <br />Total cost of <br />Capitalized at <br />service that installed 100% by pay back period over completion of Total cost of <br />Shakopee Yes development Yes customer Yes 5 years project project <br />Shelly No No No No <br />Sleepy Eye No No contractor installed Yes actual costs Yes Cost of project <br />capitalized <br />Private contractor price minus <br />Stephen No Yes does this work No Yes contribution <br />Thief Rroer Falls No No No Yes Total cost <br />