My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. ERMUSR 03-20-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
03-20-2007
>
5.5. ERMUSR 03-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2009 3:01:34 PM
Creation date
3/20/2009 3:01:34 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Muruci~al Utilities <br />13069 Orono azkway <br />Elk River, MN 55330 <br />March 6, 2007 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jerry Gumphrey <br />Jim Tralle <br />From: Troy Adams <br />phone: 763.441.2020 <br />fax: 763.441.8099 <br />Subject: Waco/Zebulon Substation and Underground Feeder Project Status <br />Pre-construction planning and permitting for the Waco/Zebulon Substation and United Health Group <br />Feeder projects aze well underway. Attached you'll find a Construction Schedule and a <br />Materials/Installation Schedule for your reference. As you can see, these schedules of critical dates and <br />major project components help provide a visual that is useful for project management. These project <br />schedules were developed around two critical dates: the 28MVA transformer delivery date and the <br />United Health Group contractual power delivery date. From these dates, the remainder of work was <br />segmented and scheduled in a logical manner. <br />The Waco/Zebulon Substation drawings have been completed and issued for the bidding of materials <br />and labor. With the exception of the substation materials, all of the major components and labor have <br />been ordered/contracted by the March 20th ERMU Commission meeting. The substation materials bid <br />will be on the March 20th ERMU Commission meeting agenda for approval by the ERMU Commission. <br />Pending weather, earthwork could begin as early as April. Regardless of weather, the earthwork, <br />concrete, duct, fence, and grounding will need to be completed by July to take delivery of the 28MVA <br />transformer. <br />The United Health Group Feeder drawings have been completed and issued for bidding. The feeder <br />installation bid will also be on the commission meeting agenda for approval. The switchgeaz, primary <br />metering cabinets, and cable have already been ordered. With the exception of Burlington Northern and <br />Santa Fe Railway Company, all required permits have been obtained. The BNSF permit has been <br />executed and submitted by ERMU and is pending final approvaUexecution by BNSF. Construction <br />could start as early as weather and materials permit. <br />By the March 20th ERMU Commission meeting, most of the costs associated with these projects will be <br />known and can be compared to the budgeted figures. An update will be provided at the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.