Elk River Municipal Utilities <br />Waco/Zebulon Substation 8~ United Health Group Feeder - 2007 Materials/Installation Schedule <br />Revised: 03/06/2007 <br />Description Contractor Bid Date Deadline Started Finished Status <br /> <br />Substation <br />En ineerin USG <br />Prelim <br />Stakin Elferin 05/01/07 Contracted <br />Galvanized Rebar Galvanizers 02/23/07 Ordered <br />Concrete Installation 03/19/07 06/01/07 02/20/07 Biddin <br />Groundin -Materials 03/19/07 02/23/07 Biddin <br />Groundin -Installation 03/19/07 06/01/07 02/27/07 Biddin <br />Fenci 03/19/07 02/20/07 Biddin <br />8" Ducts -Materials ERMU 02/20/07 Ordered <br />8" Duds -Installation 02/20/07 06/01/07 02/20/07 Biddin <br />Galvanized Steel - H' h Side Material Galvanizers 02/20/07 02/23/07 Ordered <br />Galvanized Steel -Low Side Material Galvanizers 02/20/07 02/23/07 Ordered <br />Reclosers BS 12/14/06 Ordered <br />Sub Com vents -Material 03/19/07 03/19/07 Biddin <br />Sub Erect 03/19/07 02/27/07 Biddin <br />New Circuit Switcher Ots o BS 12/14/06 Ordered <br />Relocate Transru ter - Ots o to Zebulon 03/19/07 02/27/07 Biddin <br />69KV Switch -Material MC Sales 02/07/07 Ordered <br />69KV Switch -Installation 03/19/07 02/27/07 Biddin <br />Purchase Transformer VT 12/21/06 Ordered <br />Roll Transformer onto ad <br />Transformer Connection 12/31/07 <br />Ene ize Transformer VT 12/31/07 <br />Control Wirin ERMU 12/31/07 <br />Landsca in <br /> <br /> <br />Feeder <br />En ineerin Elferin Complete <br />Cable Material BS 11/06/06 11/27/06 Ordered <br />Padmount Prima Meterin Gear BS 12/22/06 12/05/06 Ordered <br />Padmount Swit ear BS 01/04/07 12/22/06 Ordered <br />Install Contracts 03/09/07 01/30/07 Biddin <br />DNR Permit ERMU 12/28/06 01/19/07 Complete <br />MNDOT Permit ERMU 12/28/06 01/16/07 Complete <br />BNSF Railroad Permit ERMU 12/15/06 Pendin <br />Sherburne Co Permit ERMU 12/22/06 02/27/07 Complete <br />Town of B' Lake Permit ERMU 12/27/06 01/10/07 Complete <br /> <br /> <br /> <br />