Laserfiche WebLink
{Y`~. L. <br />Fps <br />f~,'".., <br />'l .; :; <br />F CAPX 2020 <br />INTERIM REPORT <br />DECEMBER 2004 <br />~ '= Minnesotans will require access to new generation facilities to meet projected growth. They <br />will need a robust transmission system, one that can provide service reliably into the future, <br />~ to support the new generation facilities. To meet these needs, significant transmission line <br />` upgrades and new transmission construction will be required over the next 1 S years. CapX <br />~~-= ` 2020 understands these needs and believes planning and construction must be done wisely, <br />'~ serving the public interest through a deliberate process that includes all stakeholders. We <br />look forward to working with stakeholders to ensure these objectives are met. <br />, ~,,, <br />CAPX 2~2U VISION TEAM MEMBERS <br />~,; <br />~ „~. - <br />~ <br />~ ~~ Will Kaul <br />~ Vice President, Transmission <br /> Great River Energy <br /> Elk River, Minnesota <br /> w-ww.greatriverener~y com <br /> Tom Ferguson <br /> Vice President, Power Delivery and Transmission <br /> Minnesota Power <br /> Duluth, Minnesota <br /> ww~w.mn~ower.com <br />Raymond J. Wahle <br />Director, Power Supply and Operations <br />Missouri River Energy Services <br />Sioux Falls, South Dakota <br />~~~~%.mrenerg~.com <br />Rod Scheel <br />Vice President, Asset Management <br />Otter Tail Power Company <br />Fergus Falls, Minnesota <br />ww~v.ot~co.com <br /> <br />Doug Jaeger <br />Vice President, Transmission, Safety & Technical Training <br />and Don Jones <br />Director, Transmission Asset Management <br />Xcel Energy <br />Minneapolis, Minnesota <br />www.xcelener~;, .com <br />7 <br /> <br />