My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-19-1991 LIB MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Minutes
>
1990-1999
>
1991
>
03-19-1991 LIB MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2010 3:47:50 PM
Creation date
3/18/2009 3:48:02 PM
Metadata
Fields
Template:
City Government
type
LIBMIN
date
3/19/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Library Board Presentation <br />September 30, 1992 <br />Page 4 <br />then a lump sum cash contribution from this transaction may be <br />available. Further, some part of the project may have to be <br />put on a lease/purchase plan. A $30-$45,000 per year annual <br />payment for 10 to 13 years could be financed through a <br />combination of Landfill Surcharge money (the $.10 currently <br />allocated), Liquor Store profits, and maybe some NSP <br />contribution. (The NSP contribution does not become available <br />until 1996 as the NSP funds from 1991 through 1995 have already <br />been allocated for the development of the Community Ed/City <br />recreation fields and the purchase of the City Hall site.) <br />Also, if there continue to be no levy limits, the City has the <br />option of levying to cover lease/purchase or bond payments. <br />Another funding issue that needs to be reviewed is a possible <br />public referendum, but I believe everyone would like to avoid <br />this request to the citizens. Finally, donations from local <br />businesses, corporations, or individuals is another source of <br />funds. This source was used to help finance the original <br />building in the early 1970's. A project may not be possible <br />unless citizens, businesses, or corporations within the <br />community support this endeavor. <br />Using the $100,000 in reserves; and using $100,000 from the <br />sale of the old City Hall site and Liquor Store contributions; <br />and obtaining a $100,000 contribution from the Municipal <br />Utilities could provide the City with $300,000 for this <br />project. Two hundred thousand dollars of additional money <br />.could be reasonably handled through a lease/purchase plan that <br />could be financed through the annual Landfill Surcharge and <br />annual Liquor Store monies. This total of one half million <br />dollars would still leave us short of financing the project and <br />leads us to the need of fundraising for the project. How much <br />is needed to be raised would be determined by the total cost of <br />the project and whether or not the above estimates can be <br />achieved or if they can possibly be increased. <br />In dealing with fundraising, everyone should understand that <br />the City is not an experienced fundraiser, nor is fundraising <br />within the capabilities of the Library Board. They do not have <br />the expertise in fundraising, nor should they have the sole <br />responsibility for going throughout the community to raise <br />monies for this project. The Library Board can certainly be <br />the City's Ambassadors for spreading the word of the need for <br />this project and can make presentations, but the Library Board <br />would be hard pressed to take the lead in this without some <br />expert advice or some consulting services from professionals in <br />the field. <br />PROJECT TIMETABLE <br />A tentative schedule is listed on Page 33, and this schedule <br />can be adjusted based on Item #2 which calls for an <br />identification of financing options. From the point of hiring <br />an architect to the occupancy of an expanded library area, it <br />is projected to take 20 to 22 months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.