My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-1991 LIB MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Minutes
>
1990-1999
>
1991
>
09-17-1991 LIB MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2010 3:49:51 PM
Creation date
3/18/2009 3:44:33 PM
Metadata
Fields
Template:
City Government
type
LIBMIN
date
9/17/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELk:: RIVER LIBRARY BOARLi OF TRUSTEES <br />MINUTES <br />SEF'TEh1BER 1-l, 19y1 <br />TRU5TEES <br />Vicki Sullivan Chair Present <br />Daryl Bronniche Vice Chair Present <br />k::en Ringstad Treasurer Present <br />Marsha O'Brien Secretary Present <br />Loeb Anderson Present <br />IN ATTENLiANCE <br />Don Horvath, Andy's Electric <br />Zack: .Johnson, E05 Architecture <br />F'at t::l aers, Gity of E14:: lover, Administrator <br />Verne Olek:snwicz, CiRRL E;;tension Services <br />Elly k::retsch, GRRL Library Regional Trustee <br />Mick: Stoffers, Librarian <br />eating was called to order at 7:U~' p.m. <br />Lion Horvath presented proposals in response to our request for <br />suggestions on how to light the ^utside sign. A photoelectric <br />fi:<ture was investigated and found to be not vandal resistant <br />and of too low wattage far our requirements. A direct light would <br />need to be raised on a post and would be difficult to aim. Two <br />proposals were presented which would utilize an 8' fluorescent <br />bul b or bulbs. The fir st proposal wo~_~i d req!~ire boring under the <br />driveway and was estimated to cost f~1i6~. The second world require <br />that the fluorescent strip be hidden under carpenter"s WOOd casing <br />and would cost ~bY~, not including the carpenter's fee. Both of <br />these would be connected tv the present timing system and would <br />come on automatically when the outside lights came on. Due to <br />the large volume of business on the agenda, our decision on this <br />was tabled until our ne;:t meeting. <br />F'at introduced Zack: ~~ohnson from E05 Architecture whom ale requested <br />attend this meeting to help us determine the nest steps in our <br />proposed new yr e:<panded facility. Zac4:: e:,plained how a work: <br />program would be set up and how we would need to wor4:: on establishing <br />a space allocation program and site selection, as well as the <br />financial and time requirements and limitations for a library. <br />He described the four Phases: 1) F'ragramming; 2l Site Selection; <br />3) Establish Estimates of Probable Development Costs; and, 4) Estab- <br />lish Schedule of Development Activities. He also discussed other <br />fees incidental to such a project and provided us with a list of <br />such fees. <br />Verne volunteered that much of this information was already <br />contained in the Draft Building Program which he prepared in <br />March, 199~r. Zack: was provided a copy of this Draft and agreed <br />that much of the information would be valuable and would save <br />
The URL can be used to link to this page
Your browser does not support the video tag.