My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. ERMUSR 03-10-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
03-10-2009
>
6.5. ERMUSR 03-10-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2009 3:03:13 PM
Creation date
3/17/2009 3:02:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/10/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utility Commission Proposed Labor Reduction Study -March 2009 <br />Impact on the Engineering Department of a 36 hour workweek <br />Locating -Looking at 2008 and 2007 locate numbers, the months of April, May, June, and July <br />make up for respectively 58% and 53% of the annual locate total. This does not give con- <br />sideration to the extensive time that road projects add to the locating workload. Spring and early <br />summer are the busiest time of the year for locating. For 2008 and 2007, the daily average <br />during these busy months was approximately 25 per day. A locate ticket can take 30-60minutes <br />or more. The same time is often needed to locate for installation of a realtor sign as that of a new <br />utility service. By law, these locates need to be done within a set window of time. A reduction <br />in hours may not always be possible because of the ticket load. In the times of the year when <br />there are fewer locate tickets, the locators assist other departments. They assist with mapping, <br />meter change out, tree trimming, and system analysis with the new thermal imaging camera. <br />Mapping -System mapping is an important tool used to protect our facilities as well as assist in <br />safe system maintenance. The workload is partially driven by new water and electric <br />construction. The workload is also driven by all the projects the linepersons do day in and day <br />out. Since taking the mapping back in-house, there has been a continuous process to increase the <br />accuracy and readability standards making the mapping a more valuable tool. There are many <br />mapping improvements in the queue to be implemented. Along with maintaining the mapping, <br />cataloging as-builds and digitizing water tie cards requires ongoing attention. Updating the <br />electrical specification book and assisting MMUA by updating their specification book are other <br />current projects. A reduction in hours would impact maintenance and improvement progress on <br />system mapping for water and electric. <br />Metering -Many of the ongoing workload can not be cut regardless of hours worked including: <br />weekly/monthly substation checks, substation maintenance, assistance with monthly generation <br />and annual urge testing, assistance with generation facility maintenance, metering equipment <br />installation, load control installation, assistance in system maintenance. Areas directly impacted <br />by a reduction in hours would fall under customer service and would include: addressing off- <br />peak issues, addressing billing/metering issues, addressing power quality issues, and <br />implementing meter change out. <br />Security -This department is unique because it's essentially a one man show. A reduction in <br />hours would result in a proportional reduction in system sales and installation. This would in <br />turn result in a proportional reduction in new monthly monitoring fee revenue. This would also <br />impact the departments ability to provide maintenance and customer service. Currently this <br />department's growth is limited by labor. Reducing labor would reduce growth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.