My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. PCSR 08-14-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2006
>
09-14-2006
>
6.1. PCSR 08-14-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2009 3:26:09 PM
Creation date
3/10/2009 3:26:08 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />(10) Traffic <br />a. Except for localized jobs, traffic through Elk River <br />associated with the Operation shall be limited to U.S. <br />Highway 10 and 169. The Operator will route traffic from <br />the Operation to 225th Ave NW west to Highway 169 <br />interchange as directed by the Minnesota Department of <br />Transportation or the City of Elk River. <br />b. The number of trucks per day is limited to 35 unless prior <br />approval is given by the Environmental Administrator for <br />special cases. <br />c. As deemed necessary by the Minnesota Department of <br />Transportation, any required improvements to the <br />highway intersection must be constructed. <br />(11) Dust Control <br />a. A permit from MPCA regarding air emissions shall be <br />obtained when required and particulate emission <br />standards shall be met by the Operation. This permit and <br />all other correspondence between the Operator and MPCA <br />shall be copied to the City. <br />b. All equipment shall be located as to reduce dust to <br />adjacent properties. <br />c. A water truck shall be on site at all times when mining <br />activities are taking place to control dust as necessary. <br />Chemicals shall not be use for dust control. <br />d. A minimum of 50 feet must be paved from 225th Ave NW <br />into the pit. <br />e. The City reserves the right to require additional <br />measures to be taken, if warranted by dust problems, <br />including but not limited to reducing stock pile heights. <br />(12) Hours of Operation <br />All mineral excavation, processing, and sales activities shall be <br />conducted between the normal hours of 7:00 a.m. and 7:00 p.m., <br />s:\planning\case files\2006\cup\cu 06-20 bauerly\gravcup-amend bauerly.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.