My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. PCSR 08-14-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2006
>
09-14-2006
>
6.1. PCSR 08-14-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2009 3:26:09 PM
Creation date
3/10/2009 3:26:08 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />area and amount of material to be mined in the following year. <br />This is to be done at time of license renewal. <br />(04) The license shall be renewed annually and shall run from June <br />1St through May 31St. The annual license fee is that which is <br />specified by the Elk River City Council at time of renewal. This <br />license fee is not in lieu of gravel tax collected by the County, a <br />portion of which the City receives. <br />(05) Violations of this Conditional Use Permit may result in <br />suspension or revocation. <br />(06) The City Environmental Administrator and/or his/her agents <br />shall be permitted to inspect the Operation for compliance with <br />the conditions of this permit during normal hours of operation. <br />(07) The City's approval of this Conditional Use Permit is subject to <br />the approval of appropriate permits by other governmental <br />agencies. <br />(08) No explosives shall be allowed for this operation. <br />(09) Reclamation <br />a. Reclamation shall be implemented on an annual basis <br />pursuant to the reclamation plans submitted by the <br />Operator. <br />b. Each year a plan for that year's reclamation shall be <br />approved by the Environmental Administrator prior to <br />issuance of the annual mineral excavation license. <br />c. The reclamation shall include topsoil from the site being <br />preserved and put back into place after mining. <br />d. Revegetation of the property shall include seeding with a <br />mixture approved by city staff accompanied by a nurse <br />crop or approved mulch. The vegetation established for <br />the reclamation must be maintained until it is self- <br />sufficient. <br />--~ e. Contours, finished grades, details of erosion control <br />methods, and settling ponds, shall comply with the plans <br />submitted and the City ordinance at the time of <br />reclamation. Additional measure as determined by city <br />staff may be required. <br />s:\planning\case files\2006\cup\cu 06-20 bauerly\gravcup-amend bauerly.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.