Laserfiche WebLink
Mr. Steve Ach <br />June 20, 1996 <br />Page Two <br /> <br />B. PRELIMINARY GRADING PLAN <br /> <br />On the western edge of Block 1, the grades from south to north are <br />adequate until they get to the very north end; then the drainage veers across <br />Lot 8, Block 1, outside of the drainage and utility easements, across the <br />rear yard. The drainage should be kept in the drainage and utility easement <br />or another easement across this lot provided. <br /> <br />Across Lots 3 through 7 of Block 1, the rear yard drainage again is outside <br />of the drainage and utility easements. Also, on these five lots the drainage <br />has two feet of fall. This is not sufficient grade to provide adequate <br />drainage in this area. <br /> <br />The storm sewer which flows between Lots 7 and 8, Block 1, should be <br />provided with an emergency overflow. It appears that is what is indicated <br />here. We would suggest that it be labeled as such and a specific highest <br />spot elevation be provided. <br /> <br />Lot 11, Block 1, has a relatively flat rear yard. We would suggest that the <br />building pad elevation on this lot be raised. <br /> <br />The symbol for the landscape planting area for screening purposes that was <br />shown along County Road 30 (Mississippi Road) is still shown in the <br />legend but has been removed from the grading plan. <br /> <br />The storm sewer manhole located at the rear of Lots 7 and 8, Block 1, <br />should be moved slightly to the north and provided with an inlet casting, <br />such that it can pick up any drainage along County Road 30 in this location. <br /> <br />C. PRELIMINARY UTILITY PLAN <br /> <br />The watermain on 179% Circle into the cul-de-sac should be looped either <br />to the north to 180% Avenue or directly east to the watermain in Heritage <br />Landing First Addition. <br /> <br />The watermain on 179th Avenue should be provided with a means to <br />extend to the south along Joplin. It is anticipated that when the <br />neighborhood to the south receives sewer and water, there will be a need <br />to loop the watermain in this location. <br /> <br />230/314-2005.jun <br /> <br /> <br />