Laserfiche WebLink
., <br />Great River Energy <br />Elk River, Minnesota <br />2008 Wholesale Rates <br />Revision: Ninth <br />CONFIDENTIAL <br />Power Factor <br />A power factor penalty charge shall be assessed to member systems that have not <br />installed capacitor additions in accordance with the annual recommendations of GRE. <br />The amount of kilovar (KVAR) penalty will be determined by the deficiency between the <br />actual KVAR installed and the recommended KVAR. The penalty charge for any such <br />deficiency is $1.00 per KVAR per month. <br />Power Cost Adjustment <br />The wholesale capacity and energy rates contained herein are subject to a monthly <br />power cost adjustment mechanism described in the PPC and set forth in Special Rate <br />Rider P of this schedule. <br />2008 Monthly Rates <br />Members shall pay GRE each month for all power, energy and delivery services <br />~. ___ <br />inisneu ac ine roiiowm rates rrom ineir res ecuve member Kesource tool: <br />Charge Type Member Resource Pools <br />All-Requirements 11/2006 <br />Power Supply Services <br />Capacity Charge (per kW-month) <br />Summer (Jun, Jul, Au) $ 12.54 $ 13.62 <br />Winter (Jan, Feb, Dec) $ 8.36 $ 9.08 <br />Sprin /Fall (Mar, Apr, May, Sep, Oct, Nov) $ 4.18 $ 4.54 <br /> <br />Ener Char a er kWh <br />Critical-peak (Up to 40 hours") $ 0.09535 N/A <br />On-peak (Mon-Fri**, 10:00-20:00 CPT) $ 0.04406 $ 0.04307 <br />Off-peak (All hours not designated as <br />Critical- eak or On- eak $ 0.02927 $ 0.02791 <br />Delivery Services <br />Transmission Char a er kW-month $ 4.61 $ 4.61 <br /> <br />Ancilla Service Char es er kW-month $ 0.61 $ 0.61 <br />Schedulin & S stem Control $ 0.07 $ 0.07 <br />Reactive Su I and Volta e Control $ 0.22 $ 0.22 <br />Re ulation and Fre uenc Res onse $ 0.15 $ 0.15 <br />O eratin Reserve - S innin $ 0.14 $ 0.14 <br />O eratin Reserve -Other $ 0.03 $ 0.03 <br />c.;ritical-peaK penoas wul ae aeclared by (iKC no later than 16:00 CPT on the day(s) prior to <br />actual use and are subject to other specifications contained in the PPC. <br />"' Excludes the following holidays if they fall on a weekday: New Years Day, Memorial Day, <br />Independence Day, Labor Day, Thanksgiving Day and Christmas Day. <br />GRE Confidential 2 Effective: 01/01/2008 <br />