My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. ERMUSR 10-09-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
10-09-2007
>
6.3. ERMUSR 10-09-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2009 11:24:35 AM
Creation date
2/10/2009 11:22:44 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on our recent experience with the relicensing of a hydroelectric facility in Michigan, it is estimated <br />that the process could cost between $500,000 and $2,000,000. The actual costs will be highly dependent <br />upon the position of the stakeholders and the studies that are required. <br />Attached as Appendix 2-2 are the table of contents and some selected sections from a Draft License <br />Application for Minor Water Power Project, Minnesota Falls Hydroelectric Project, FERC Project No. <br />10336-00 and Initial Consultation Package Orienta Hydro Project FERC Project No. 10781-00. <br />The City of Granite Falls held the preliminary permit for the Minnesota Falls dam at the time the draft <br />license application was submitted. Dahlberg Light and Power Company was seeking the preliminary <br />permit when the initial consultation package was submitted. These two documents provide examples of <br />the level of effort that was required for these two projects and might represent the level of effort required <br />for the Lake Orono Dam. <br />P:\Mpls\23 MN\71\2371089 Elk River Municipal-Orono DamlWorkFileslReportlLake Orono Dam Assessment Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.