My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. ERMUSR 10-09-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
10-09-2007
>
6.3. ERMUSR 10-09-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2009 11:24:35 AM
Creation date
2/10/2009 11:22:44 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 Introduction <br />Elk River Municipal Utilities is considering redevelopment of hydroelectric generation at the Lake Orono <br />Dam project. The Lake Orono Dam formerly generated electricity. It has been reported that the <br />powerhouse formerly had two 150-KW generating systems. When the dam was rehabilitated in the early <br />1980s, all of the equipment was removed and the powerhouse intakes and outlets were filled with <br />concrete. Presently the dam impounds water that creates Lake Orono that is a valuable regional resource. <br />This report presents the results of a preliminary evaluation of issues related to redevelopment of <br />hydroelectric generation. Redevelopment of hydroelectric facilities requires an economically viable site <br />and careful attention to the permitting issues. The following sections present the results of preliminary <br />assessment of the following categories: <br />• Relicensing Process <br />• Assessment of Generation Capability <br />• Economic Factors <br />• Summary and Conclusion <br />P:\Mpls\23 MN\71\2371089 Elk River Municipal-Orono Dam\WorkFiles\Report\Lake Orono Dam Assessment Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.