My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7. PRSR 04-11-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2007
>
04-11-2007
>
7. PRSR 04-11-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2009 9:51:01 AM
Creation date
1/20/2009 9:23:03 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
4/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River Top of the World Restoration - 2007 Metro Greenways Site Restoration Nomination Page 6 <br />IV. Budget <br />Complete only the sections that apply to your project. Use blank rows for any additional elements. <br /> Metro Greenways Grant Cash Match In-Kind Match <br /> Cost Share Ci Ci <br />Project Management <br />(Communications and scheduling related to <br />design and installation) O 0 500 <br />Project Design <br />(Detailed site plan and finali=e plant list) $ 125 $ 125 $ 0 <br />Grant Administration <br />Manage funds, prepare final report) $ 0 $ 0 $ 250 <br />Site Preparation <br />(brush and invasive tree cut/treat/disposal, <br />herbicide existing nonnative grass, <br />prescribed burn, spot treatment of any <br />regrowth prior to seeding 28-35 total acres <br />treatment, 4-5 activities.) 2 975 2 175 800* <br />Plant Material <br />(Seed and live plants) 2 725 2 725 0 <br />Supplies and Materials <br />(Mulch, Herbicide, stakes, erosion control <br />matting, temporary fencing 0 $ 0 0 <br />Equipment Rental <br />(Earth-moving equipment, chippers, saws, <br />etc) 0 0 0 <br />Installation <br />(Labor by contractor) 1 050 0 0 <br />Maintenance (mow, spot spray) <br />(Labor by contractor) 3 240 0 0 <br />Other (Design, manufacture and <br />installation of interpretive sign) <br /> $ 0 3 900 0 <br />Other ( ) <br /> $0 0 $0 <br />Subtotals 10 115 8 925 1 550 <br />* burn break construction by city staff <br />Metro Greenways Cost Share (subtotal from above) 10 115 <br />Match (cash and in-kind, subtotal from above) $10,475 <br />Total Project Cost 20 590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.