Laserfiche WebLink
11. Staff updates <br />Over the last few months we have been pursuing a safety grant from the Minnesota <br />Department of Labor and Industry for a scissors lift for the Arena. After being rejected <br />two times, the third submittal was approved. The Department of Labor and Industry <br />awarded $6,230.00 in matching funds for the scissor lift. On Apri12°a City Council <br />Meeting, the Cities Safety Officer (Bruce West) and I proposed purchasing a scissor lift <br />for $12, 460.11. The city council approved the request and the scissor lift was purchased <br />the next day. The lift will be used for several items throughout the building, mainly for <br />changing rink bulbs and cleaning higher areas in the buildings. The lift will also be used <br />to change the Arena's parking lot bulbs and used for other projects throughout the city. <br />This summer we have several projects that we will be working on. The north end of the <br />Barn will be remodeled with the center wood to match the rest of the Barn. The railings <br />in the Olympic rink will be painted along with some of the locker rooms and lobby. A <br />portion of the roof over the lobby will be re done so that the water will floe to the roof <br />drains and not pond up in the corner of the building. Locker room benches will be <br />replaced in all of the locker rooms, provided that we receive the money needed from the <br />land abatement fund. The Olympic rinks ice will be re painted this spring and will be <br />ready to skate on in June. This is the time of the year that building receives its main <br />cleaning, from top to bottom. The Veterans of Foreign War donated $3,500.00 to install <br />a flag pole in front of the building, that project will include some prep work from the <br />street department before it can begin. <br />