Laserfiche WebLink
C. Low E -Ceiling <br />A Low E Ceiling is basically an insulation system that covers the ceiling of the rink <br />area. The Low E -Ceiling is designed to help reduce heat load to the ice sheet which <br />will result in the compressors running less. There are several options and opinions <br />out there from a number of manufactures. I talked with one representative from an <br />low e -supplier, he gave me a rough quote of $40,000.00 for the Olympic, and <br />$35,000.00 for the Barn. Since there are so many options, we are going to explore <br />them and present them to the Commission at the next meeting. <br />D. Energy Management System <br />An energy management system would be a nice addition to the Arena. However the <br />money that would be needed for such a system would be better spent on replacing <br />some outdated equipment with energy efficient equipment. Some of these items <br />include soft start motors for the compressors or adding capacitors to the existing <br />compressors, and replacing Barn's condenser. After some of these items are <br />completed, it would then make sense to move forward with an energy management <br />system to control the buildings utilities. <br />9. Walking Track <br />We have approached the Lions Club for a donation for a synthetic matting system for the <br />walking track. The matting system would have a bottom padding that would help ease <br />the stress on walkers joints when they are walking on the track. The synthetic matting is <br />very durable and is easily maintained. The cost of this system is about $35,000.00. We <br />are hoping that the Lions Club will respond considerately to our request. <br />10. Remodeling of front entryway and Lobby <br />Over the years it has been apparent that the lobby at the arena is insufficient. When <br />approaching the local youth hockey district about planning a big tournament at the rink, <br />the first question or concern that is brought up is the size of the Lobby. During Varsity <br />games it is extremely crowed and is almost impossible to navigate through the lobby to <br />get to the bathrooms. People in line for the concession stand are constantly moving to <br />allow people to cut in front or behind them in order to allow them to pass by. We are in <br />need of a meeting room as well as an office area for staff and a storage area for janitorial <br />supplies and equipment. The Skating Academy can not hold competitions due to the fact <br />that their association requires a place for the judges as well as an area for a hospitality <br />room. The list could go on, the bottom line is that we have out grown our lobby space a <br />long time a go and need to move forward on a larger up to date space that will move us <br />into the future. Bill and I have talked several times about the Arena's needs and would <br />like to move forward with hiring an architect to get a rough draft of the design and the <br />costs associated with the project. <br />