Laserfiche WebLink
Ice Arena Comrnission Memo Page 4 of 5 <br />August 8, 2006 <br />-------------- <br />Club to see how each one of them will be able to utilize the open hours to optimize all of <br />the hours. <br />Last April, the Arena Commission reviewed the ice rates for this coming season and <br />decided keep the ice rates at their current level. At that time I made the recommendation <br />to the Commission that we look at the 2007 summer rates in August. Attached for your <br />review are some surrounding Arena's ice rates for the summer of 2007, <br />as you will see the average rate is $138.00 an hour. My recommendation to the <br />Commission is to raise the summer hourly prime time rate from $125.00 an hour to <br />$135.00 an hour. When researching the summer rates, a few managers indicated that <br />they are looking at increasing their regular season prime time for the 2007 - 2008 to <br />$180.00 an hour. <br />10) Arena Commission Meetings <br />There has been some discussion of adding one or two meetings a year to the Arena <br />Commission. Currently, the Arena Commission meets two times a year, the <br />second Tuesday in April, and the second Tuesday in August. The two meetings have <br />seemed to work well over the years. When specific items needed to be addressed, the <br />Commission has called special meetings to address them. Whether dates are added or not, <br />I would suggest that the dates of future meetings are not changed, unless it is the <br />consensus of the Commission to do so. <br />11) Staff Updates <br />A) Summer projects <br />We have finished the Center Groove along the north wall. We are now in the process of <br />re-installing the boards and putting up the protective netting. <br />Shaft seals will be replaced on Compressor # 2 on the Barn's ice plant, and on the # 1 <br />Compressor on the Olympic ice plant. The oil on all four Compressors will be changed <br />before the regular season begins. These items are regular maintenance items and need to <br />be performed after so many hours of operation. <br />A project that was put on hold this summer was installing new benches in the locker <br />rooms. The Arena's budget had funds in it to install benches in two locker rooms. After <br />talking to Rebecca Haug, The City's Environmental Administrator, it was concluded that <br />since the project used recycled materials from milk cartons, the project could be funded <br />with abatement money from the landfill. Since the project was expanded to all eight <br />locker rooms, it was decided that. it should be part of the 2007 Arena Budget. <br />This fall we are installing coat hangers in all the locker rooms as well as shelves in locker <br />rooms 1 thru 4. <br />B) N.H.L. Charity game <br />The N.H.L. charity game was held June 23rd. According to Trevor Stewart, the charity <br />coordinator, $9,750.00 was raised for the charities. There were about 800 people in <br />attendance, and the concession stand made about $1,400.00 that evening. From all <br />aspects, the game went over very well. <br />