My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICESR 09-28-2004 INFORMATION
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2000-2009
>
2004
>
09-28-2004
>
ICESR 09-28-2004 INFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2009 9:55:25 AM
Creation date
1/16/2009 9:55:25 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
9/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ Year• Front addition /lobby: Estimated cost: $1,000,000 <br />An addition to the lobby would definitely enhance the Arena. As it is now it gets very <br />crowded during busy times at the rink. It would be nice to be able to have office space in <br />this area so that the general public can easily get in contact with someone when visiting <br />the Arena. At this time the southwest corner upstairs by the bleachers of the Olympic <br />rink could be finished for an office space area. There has been some talk about a field <br />house being built on the eastside of the Arena. If this comes about, it would be beneficial <br />to see if a common lobby area between the field house and the Arena could be <br />constructed. <br />`~~ Year• Remodel upstairs area• Estimated cost: $75,040 -100,000 <br />The bleachers are removed in the south end of the Barn. <br />The Arena is in need of an area where meetings can be held as well as storage and office <br />areas. This would be a good project to combine with one of the Arenas users such as Elk <br />River Youth Hockey. <br />~~ Year• Artificial Turf: Estimated cost: $80,000.00 <br />The artificial Turf will give the Arena another source of revenue. Indoor soccer as well as <br />Lacrosse programs could be played in the spring when the ice is out in the Barn. <br />This project should be put on hold until it is determined when and if a field house is <br />going to be built in Elk River. If a field house were to be built, we would have to <br />determine if it is feasible to have turf in the Barn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.