My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICESR 09-28-2004 INFORMATION
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2000-2009
>
2004
>
09-28-2004
>
ICESR 09-28-2004 INFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2009 9:55:25 AM
Creation date
1/16/2009 9:55:25 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
9/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2007: Condenser for the Barns Ice Plant: Estimated cost: $35 500 <br />The Barn' condenser will be at the end of its life expectancy and should be replaced <br />before any major problems arise. We are starting to notice some of the same symptoms <br />that we are experiencing with the ~lymplC Tlllk C011deT1SeI. <br />2008: Re -slap the Low Pressure Receivers on Ice Plants: Estimated Cost: $10 000 <br />The Low Pressure Receiver is a large holding tank where the refiigerant is stored in the <br />Ice Plant. The outside is insulated with a dense insulation that is held in place by sheet <br />metal that is wrapped around it. Over the years this sheet metal has become rusty and is <br />pulling away of the insulation, causing the insulation to come off. We have made some <br />patches to keep the sheet metal secure, however it is getting to the point where repairs <br />will not hold up. <br />2009: Electric Ice Resurfacer: Estimated cost: $85 000 - $95 000 <br />By this time the existing Electric machine will have over 5,000 hours of use on it, and the <br />back up machine (Old Blue) will need a major over haul. By establishing an Ice <br />Resurfacing purchasing plan the Arena will operate more smoothly without unexpected <br />problems arising. <br />2010: New Heatin S stem For the Barns Locker rooms: Estimated cost: $7 500 - <br />$12,000 <br />The heating system in the Barn's locker rooms is a home furnace that was installed in the <br />year 2000. B @ D Plumbing told me that the furnace would last about ten years in this <br />type of environment. We can either install a heating system that is designed for Arena's <br />environment, (like the in -floor heating in the Olympic rink) or we can keep on changing <br />out the furnace every eight to ten years. The in floor heating system will cost more <br />upfront, but will save us in energy cost in future years. If we decide to go with the <br />furnace we would still have to install new ductwork, the old ductwork is beat up from. <br />years of abuse. <br />`!?: Paintin of the ceilin of the Ol m is rink: Estimated cost: unknown <br />Due to humidity problems when the rink opened in 1997, the ceiling of the rink has <br />experienced rust and molding on the ceiling. Since we have installed a dehumidifier, the <br />rusting and molding on the ceiling has subsided. We will continue to monitor the ceiling <br />to determine when we should paint the ceiling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.