Laserfiche WebLink
Benefit Cost Ana/ysis <br /> <br />Anton, Lubov (2003) <br /> <br />· Validated/added to MnDOT study <br /> <br />· Updated discount rate to current OMB rate <br />· Based on MnDOT inter-regional corridor study of <br /> TH 10 <br /> <br />· Added conservative estimate of time saved by <br /> highway travelers <br /> <br />· Added cost of linkage to Hiawatha LRT <br /> <br />· Did NOT perform a comprehensive new BC <br /> analysis <br /> <br />Anton, Lubov & Associates, Inc <br /> <br />Benefit Cost Ana/ysis <br /> Benefits vs. Proposed Total Cost <br /> (PV in 20075) <br /> <br />Benefits <br /> <br />$579 million <br /> <br />Costs <br /> Capital cost <br /> All operating costs <br /> <br />$302 million <br />$200 million <br /> $502 million <br /> <br />Benefit Cost Ratio = 1.15 <br /> <br />Anton, Lubov & Associates, Inc <br /> <br />4 <br /> <br /> <br />