Laserfiche WebLink
Mr. Steve Ach <br />April 17, 1996 <br />Page Two <br /> <br />There is a second access of a more minor nature immediately south from the new <br />church facility onto 4th Street. It is not clear from the site plan whether or not this <br />driveway access is immediately north of Holt Avenue. If not, the access should <br />be realigned to meet Holt as a 4-way intersection. <br /> <br />o <br /> <br />The parking in front of the old church facility at the southwest corner of the site <br />is proposed to be changed to diagonal parking and a median installed to separate <br />the parking from 4th Street. Access to this parking would be one-way in off of 4th <br />Street and one-way out off of Irving Avenue. This new island to be created which <br />will separate the parking from the street should also contain a 6-foot wide sidewalk <br />which will then continue the existing sidewalk from its current terminus point to <br />the west to Irving Avenue. <br /> <br />Consideration should be given as to whether or not concrete islands should be <br />installed in the parking lot to help delineate the parking and driving isles. This has <br />to be measured against the potential loss of parking stalls by installing islands. <br /> <br />The Fire Chief has requested that two hydrants be located on the site, one at the <br />southeast corner of the new church facility, and one at the northeast corner. He <br />has also indicated that, due to the size of the facility, he would like to see the <br />.watermain looped from 4th Street through the front of the church facility and then <br />along the north line out to Irving Avenue. We would concur with this <br />recommendation. <br /> <br />o <br /> <br />Glenn Sundeen from the Elk River Municipal Utilities has indicated that there is <br />an overhead 3-phase power line along the north property line of the site. The site <br />plan indicates three light poles in this location. Glenn questioned how tall they <br />were and whether they would provide the necessary separation between his power <br />line and the light pole fixture. Glenn has also asked that easements be provided <br />on the site for this existing power line and power service to the new church <br />facility. <br /> <br />Storm drainage for the site consists of sheet draining the parking lot to two low <br />points where catch basins and small diameter storm sewer will convey the runoff <br />to a retention pond. The drainage facility is sized to take all of the increased <br />runoff from the parking lot and most of the new church facility, with the exception <br />of the driveway at the north end of the site. The sizing of the pond for <br />sedimentation is appropriate. The pond itself is proposed to have 3:1 side slopes <br />and to be entirely fenced because of the proximity of school-age children to the <br />site. An outlet for the pond will be provided from the 4th Street storm sewer <br />which was constructed several years ago with the upgrade of that street. <br /> <br />230/304-1704. apr <br /> <br /> <br />