My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 05-20-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
05/20/1996
>
7.3. SR 05-20-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:19 AM
Creation date
3/13/2003 7:32:11 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/20/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COX [LTING ENG[NEEI <br /> <br />1326 Energy Park Drive <br /> <br />St. Paul, MN 55108 <br /> <br />612-6~-4389 <br /> <br />1-800-888-2913 <br /> <br />Fax~ 612-6~-9446 <br /> <br />April 17, 1996 <br />File: 230-304-11 <br /> <br />Mr. Steve Ach <br />City Planner <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: ST. ANDREW'S CHURCH SITE PLAN REVIEW <br /> <br />Dear Mr. Ach: <br /> <br /> CIVIL ENGINEERING: <br /> ENVIRONMENTAL <br /> MUNICIPAL <br /> <br /> PLANNING <br />~JSOLID WASTE <br /> STRUCTURAL <br /> SURVEYINg <br /> TRAFFIC <br /> TRANSPORTATION <br /> <br />ELECTRICAL/MECHANICAL <br />ENGINEERING: <br /> <br />HVAC <br /> <br />POWER D~STRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br />MINNEAPOLIS <br />PRIOR LAKE <br />ST. PAUL <br />WASECA <br /> <br />As requested, we have reviewed the site plan for the St. Andrew's Church project. The <br />site plan was prepared by Vanman Companies and was dated March 25, 1996. Based on <br />our review and comments received at the April 4, 1996, staff review meeting, we would <br />offer the following comments: <br /> <br />The proposed new church facility will have seating for 1,000 in the first phase. <br />It will be expandable to 1,500. The parking required with the first phase is 333 <br />parking stalls. The site plan shows 280 stalls within the parking lot itself. They <br />have also indicated off-street and remote parking sites that are available, which <br />brings the total number of parking stalls to well over the 333 required. Even <br />though the number of stalls on the site is approximately 50 less than required, this <br />is certainly a vast improvement over the current situation, which has very limited <br />on-site parking available. <br /> <br />The main point of ingress and egress will be along the northern lot line to Gates <br />Avenue. The driveway shows a flaring out of the bituminous surface as it meets <br />Gates Avenue to provide three lanes of traffic, one coming into the site, and two <br />going out, one for left turns and one for right turns. We would recommend that <br />the expanded bituminous surface be carried further west and allow for more cars <br />stacking as they exit the site. <br /> <br />Also in the location where this driveway meets Gates Avenue, the home <br />immediately north of this area has a driveway that exits onto Gates Avenue also. <br />This driveway is not shown on the plan. The new church driveway and the <br />existing home driveway should be combined into some type of joint access point, <br />rather than have two driveways immediately adjacent to each other. <br /> <br />230/304-1704. apr An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.