Laserfiche WebLink
1. Water connection to~Zane Street wilt require a traffic control plan and.restoration of the street . <br />must occur immediately following'the connection, including bituminous patching... <br />.The Owner will be responsible for obtaining. a. detailed Construction signage And trai~lc <br />control plan. Contractor will be respo~ible far lmmediste street restoration and <br />. bituminous patching. ~ ~ .. <br />2. Pond outlet~structtire should include a sloped open top, fit into the pond slope as shown in <br />Standard Plate #2513. The inlet pipe to the control structure should be a minimum ~of 12" .in <br />diameter. if an orifice is needed, it can be built into the interior baffle in the out[eE structure. <br />The pond outlet structure will be revised per Standard Plate #2513. The orifice: will be <br />shown in an interior baffle: . <br />3. Sanitary sewer manhole {SSMH1) seems redundant, since the stinitary sewer could connect to <br />the existing manhole by core drilling into the structure. ~ . <br />SSMH1 is b~eing proposed in ordec bo avoid conflict during sanitary sewer construction with <br />utilities (ie: gas; electric, telephone, etc), which may exist along the east propeerty. line of the ~ _~ <br />site. We $t a proposing to run the sanitary sewer some distance- away ~fitom; and parallel to; . <br />the east property line and then turning about 90 degrees (at SSMHl) to connect with-the <br />existing manhole. ~ ~ . <br />4. Show elevations for the sanitary services to the buildings: It appears.there is a crossing <br />conflict with the proposed watermain. . <br />The plans wfil be revised to show sanitary sewer elevations to the buitding~.. Elevations will <br />be adjusted if a conflict exists. <br />Record drawing plans and GIS data will be required on all utilities (private and public) after <br />completion of construction. Specific information relative to the format can be provided by the <br />Engineering Division. <br />The Owner will be responsible for obtaining record drawing plans and GIS data, and <br />submitting it to the City. <br />C: Storm Water Calculations <br />1. Provide calculations showing the amount of dead storage required and provided in the pond. <br />Storm water calculations wilt be provided showing required and provided dead storage <br />volumes. <br />2. Use a CN of 99 for area of pond up to' the 10U-year HWL. <br />Storm water calculations will be revised to show a CN of 99 within the H~VI. pond area. <br />Pond ,will be adjusted on the grading plan, if necessary. <br />2 <br />