My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 08-12-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
08-12-2008
>
5.1. PCSR 08-12-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2008 2:20:21 PM
Creation date
12/16/2008 2:20:21 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/12/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~„~ ® - <br />~~ <br />~~ ~ Gxi~!~~, <br />U. <br />350 Iiwy. 10 Bouth, Suite 101; St. C1oud,1VIN 56304 <br />(320) 269-6b7b • Fax: (320) 259-6991 • www duffyeng.com <br />August 5, 2008 <br />City of Elk River <br />13065 Orono Farkway <br />Elk River, MN 55330 <br />Attention: Jeremy Barnhart, AICP <br />Planning Manager <br />RE: Proposed Zane Street Commons <br />Elk River, MN <br />Prof, N4.08-? 14 <br />Below are our responses to the comments forwarded to us from the Elk River City Engineer, <br />dated 07/30!08. Our responses are as follows, and will graphically appear on the pertinent <br />drawings when submitted for building permit: <br />A. Grading Plan <br />1. Revised pond slopes to match. Standard Plate X2511 <br />Pond will be revised to show pond slopes per Standard Plate #2511. The standard plate will <br />be included on the plans. <br />2. -Provide a 2-foot boulevard between the back of curb and the retaining wall. <br />Plans will be revised to show 2-foot boulevard. <br />3. Fencing of some type needs to be provided on the top of the retaining wall, ~dne to its height. . <br />Fencing to be shown oa Architectural plans. <br />4. A retaining wall design will need to be submitted, since the wall is over 4 feet high. <br />The Owner will be responsible for obtaining a retaining wall design from a Structural <br />Engineer, and submitting it to the .City. <br />5. Grading at the northwest corner of the site blocks off the drainage pattern previously in place. <br />Install storm sewer to provide an outlet for this area. <br />Plans will be revised to show storm sewer extended to this area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.