My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0 EDSR 12-08-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2008
>
12-08-2008
>
6.0 EDSR 12-08-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2008 3:54:35 PM
Creation date
12/8/2008 12:53:45 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
12/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River FAST project <br />December 4, 2008 <br />Page 4 <br />Task 6-Refine concepts to a preferred plan <br />6.1 Refine concepts and prepare the preferred plan: As an outcome of the Advisory <br />Panel Workshop and EDA and staff review, we will refine the concepts into a <br />preferred plan. This task includes preparing the first draft of the plan document <br />emphasizing the preferred concept. <br />6.2 Prepare impact analysis (traffic and infrastructure demand) for the preferred plan: <br />At a general level, we will evaluate demand for roadway capacity and infrastructure <br />(sanitary sewer and water) that can be used by the City Engineer to help identify <br />long term infrastructure improvement needs. HKGi will rely on the City Engineer <br />for existing infrastructure capacity information. <br />6.3 Prepare implementation mechanisms: We will use materials generated in previous <br />tasks, and the creative discussions generated through the workshops and joint <br />EDA/PC/CC meeting to develop implementation strategies focused on the following <br />topics: 1) regulatory tools which may affect zoning and subdivision regulations or <br />involve preparation of design guidelines 2) marketing strategies 3) development <br />strategies (phasing, timing of public improvements, financing, environmental <br />reviews and other "value" added strategies). <br />6.4 Review meetings with staff to review draft materials and discuss implementation <br />strategies. <br />6.5 Conduct review meeting with EDA/PC/CC: A final joint meeting with the advisory <br />boards and City Council would be held to present the full draft plan for comment. <br />6.6 Refine draft plan: Based on the outcomes of review meetings we will refine the plan <br />and submit a final draft to the City. <br />Deliverables: <br />^ We will deliver three hard copy bound plans and 1 CD for reproduction of the plan at <br />its Draft Stage (after task 6.3) and again at its Final Draft Stage (after task 6.6). <br />^ Agendas and facilitation of review meetings. <br />Task 7-Finalize plan and seek approvals <br />7.1 Attend City Council meeting: HKGi staff will attend to present and answer <br />questions for the final meeting seeking approval of the plan. <br />7.2 Plan revisions and modifications: HKGi will prepare one final set of revisions <br />following the final approval of the plan. <br />Deliverables: <br />^ Final plan: We will deliver three hard copies and one CD of the final plan. <br />^ Electronic files: HKGi will provide the City with all CAD files as well as all graphics <br />and text documents to close out the project. <br />B. OPTIONAL SERVICES <br />Optional Task 1.0 The incorporation of a series of area stakeholder meetings. The <br />project area would be broken down into a maximum of (4) sub-areas, identifying <br />landowners that may have similar land-use related issues based on the location of their <br />
The URL can be used to link to this page
Your browser does not support the video tag.