Laserfiche WebLink
r~ity of <br /> <br />MEMORANDUM <br /> <br />iver <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Mayor & City Council <br /> <br />Pat Klaers, City A~or <br />iMc~Y:'el::~ssues × <br /> <br />ITEM 5.6. A-C <br /> <br />It appears that the long ice arena project planning process is winding down <br />and that we are close to awarding the ice arena bids and beginning <br />construction. I say that we are close because the city should wait to sign the <br />contracts until the local banks have confirmed that they will be participating <br />in this project in the amount of $2.1 million and at an interest rate that <br />compares favorably to the public bond market. Even after this bank <br />commitment, the city still needs to hold a public hearing on the issuing of the <br />bonds. <br /> <br />As previously reviewed with the City Council, the bids were very favorable <br />for this project. The construction bids and soft costs (i.e., architect fees, legal <br />fees, construction manager fees, ice consultant fees, construction contingency, <br />builders risk insurance, engineering, bond issuance fees, etc.) bring the <br />project to an estimated $2.65 million. This excludes the contributions from <br />the city/utilities and youth hockey. The city/utilities contributions include <br />the city portion of the building permit fee, sewer and water expenses to <br />connect to Lowell Street (engineering, land acquisition, and actual <br />construction) SAC and WAC fees, removal of the light poles, electric <br />connection fee, and parking lot signage/striping. The youth hockey <br />contributions include the locker room accessories, landscaping, signage, <br />scoreboard, concession equipment, paint and labor for both interior and <br />exterior areas, hockey goal nets, hockey equipment, and other items for the <br />interior part of the building. Additionally, it should be noted that the locker <br />rooms will not be finished and that two of the three sets of bleachers will also <br />not be provided. The permanent bleachers are in the project but the <br />retractable bleachers are not. <br /> <br />The financing for the project is $2.6 million plus $50,000 from youth hockey <br />over time. The $2.6 million comes from the bank ($2.1), the Mighty Ducks <br />grant ($250,000), the city ($50,000), youth hockey cash ($150,000) and the <br />Rogers Plastics Foundation ($50,000). The $50,000 over time from youth <br />hockey is needed to make the project work. However, the city needs this <br />money in 1996 in order to pay off the contractor. Accordingly, the city should <br /> <br />13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 <br /> <br /> <br />