My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LIB AGENDA 10-28-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Packets
>
2000 - 2009
>
2008
>
LIB AGENDA 10-28-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2013 9:56:05 AM
Creation date
11/17/2008 11:05:23 AM
Metadata
Fields
Template:
City Government
type
LIBAG
date
10/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fiver <br />MEMORANDUM <br />TO: Library Board <br />FROM: Bill Maertz, Parks and Recreation Director <br />DATE: October 28, 2008 <br />SUBJECT: Installation of New Fireplace Insert <br />Item: <br />Attached, please find preliminary shop drawings and images for a custom built fireplace <br />insert for the Library. Installation includes the following: <br />• Shop drawings and permits <br />• Stainless tapered burner with heat treated rocks <br />• Replace old glass with tempered, high heat glass <br />• Power vent and chimney <br />• Rain cap <br />Financial Impact <br />Cost for fireplace $13,285 <br />A Gas line will need to installed from the CenterPoint gas line in the street at a cost of <br />approximately $3,526. <br />Installation of a supply line from the gas meter to the fireplace unit is approximately $1,000. <br />Total project cost - $17,811 <br />This project could be funded by a combination of reallocating a portion of the unspent <br />utility budget and by reserves. <br />Attachments: <br />Fireplace quote <br />Preliminary drawings <br />Fireplace burner image <br />
The URL can be used to link to this page
Your browser does not support the video tag.