Laserfiche WebLink
Mr. Steve Ach <br />April 8, 1996 <br />Page Two <br /> <br />o <br /> <br />The need for a booster pumping station for the water system in this plat is being <br />evaluated in detail at this time. It may be determined that the booster pumping <br />station is only needed to serve a small number of lots. If this is the case, an option <br />for the Developers would be to not construct a booster pumping station and also not <br />develop those lots which would require that facility for water service. If that is the <br />chosen alternative, those lots which cannot be served by water should also be <br />reflected as outlots on the final plat. <br /> <br />o <br /> <br />To date, we have not received drainage calculations for this plat. These should be <br />submitted and reviewed prior to filing of the final plat, because they could affect the <br />size and/or need for drainage and utility easements. <br /> <br />If you have questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />TJM:tw <br />288-0804.apr <br /> <br /> <br />