My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 04-23-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
04/23/2001
>
4.2. SR 04-23-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:13 AM
Creation date
2/5/2003 9:25:15 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/23/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bidder <br />Triple Combination Pumper Specifications for the Complies <br /> <br />City of Elk River Minnesota yes No <br />- Two (2) Red/Clear dome lights located one (1) each side, controlled by the following: <br />Clear forward light controlled by the door switch and the lens switch. <br />Red rearward light controlled by the lens switch. <br />- A courtesy light at each door opening, controlled by automatic door switches <br />CAB HEATER <br />There shall be a 40,000 BTU heater in the cab located below the right side cab dash. <br />The heater/defroster ventilation shall be built into the design of the cab dash instrument panel. <br />The heater ducts shall be vented in a manner to provide heat directed towards the officer and <br />the driver. <br />The defroster ducts shall be designed to provide maximum defrosting capabilities for the front <br />cab windows. <br />Heater defroster controls shall be located on the cab dash within easy reach of the driver. <br />CREW CAB HEATER <br />An auxiliary heater with 50,000 BTU shall be provided inside the crew cab. The heater shall <br />have a three (3) speed blower, and temperature controls located adjacent to the heater. <br />Heater shall be mounted in seat riser. <br />AIR CONDITIONING <br />A high performance air conditioning system shall be furnished inside the cab and crew cab. <br />The air conditioning system shall perform as follows: <br />In 100 degree Fahrenheit ambient temperature with 50 percent relative humidity and at <br />maximum compressor speed, the cab and crew cab shall cool down to 75 degrees Fahrenheit <br />within 30 minutes. Actual test results from the manufacturer of the air conditioning system, <br />verifying this performance requirement, shall be submitted with bid. <br />A 19.0 cubic inch compressor shall be installed on the engine. <br />A roof-mounted condenser, with adequate BTU to meet the performance specification, shall be <br />installed on the cab roof. <br />Two (2) evaporator units shall be installed in the cab, located in the following locations: <br />- One (1) in the cab dash, just to the front of the officer <br />Page 21 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.