Laserfiche WebLink
Case File: CU 08-11 <br />Page 2 <br />Attachments <br />• Location Map <br />• Memo from Public Works Director dated May 20, 2008 <br />• Memo from Sherburne County Public Works dated May 13, 2008 <br />• Memo from Fire Chief dated May 20, 2008 <br />Applicant's Narrative <br />• Site Plan(s) <br />• Architectural Drawing(s) <br />General Information <br />Spectrum High School <br />C&P Properties <br />Applicant C&P Properties <br />60 Day Rule The application has been deemed complete as of May 8, .2008. <br />The Ciry must take action b June 28, 2008 <br />Requested Action Interim Use Permit for Temporary Class Rooms <br />Location and Size Spectrum High School <br />Location Existing Use Land Use Plan Designation Current Zoning <br />Subject <br />Property Residential Urban Residential R1d Single Family <br />North Residential Urban Residential R1d <br />South Residential Urban Residential R1c Single Family <br />East Residential Urban Residential PUD <br />West Residential Urban Residential R1d <br />Overview <br />Spectrum High School, as part of their Interim Use Permit (IUP), wishes to install a 6,860 square <br />foot temporary modular building for classrooms. The building will be located west of the future <br />proposed high school along the west property line, and southwest of the existing modular building. <br />It is the understanding that the current enrollment is approximately 130 students. They need the <br />second unit in order to reach an enrollment of 285 students; at this point the school can bond for <br />construction for a permanent building. This is the number of students that was discussed with the <br />original IUP from July 18, 2007. <br />S:\PLANNING MAIN\Case Files\CUP\CU 08-11 Spectrum (C and P Prop)\CU 08-11_PC.doc <br />