My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 06-16-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
06-16-2008
>
5.1. SR 06-16-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2008 3:45:58 PM
Creation date
6/13/2008 10:45:33 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ji <br />.~.,.~. <br />Elk <br />River <br />REQUEST FOR ACTION <br />To Item Number <br />Plannin Commission 5.1 <br />Agenda Section Meeting Date Prepared by <br />Plannin Items une 10, 2008 Chris Leeseber ,Park Planner-Planner <br />Item Description Reviewed by <br />Request by C & P Properties, LLC for Interim Use Permit for erem Barnhart, Plannin Nlana er <br />Additional Temporary Classroom, Reviewed by <br />Public Hearing -Case No. CU 08-11 <br />Action Requested <br />Staff recommends that the Planning Commission recommend approval of the Interim Use Permit <br />request, as illustrated on drawings dated 4-28-08, with the following conditions: <br />1. All comments of the Public Works Director memo dated May 20, 2008 shall be <br />addressed. <br />2. All comments and conditions of the Sherburne County memo dated May 13, 2008 <br />shall be addressed. <br />3. As a Conditional Use Permit is not a Building Permit, the applicant shall apply for all <br />require permits. <br />4. The temporary access shall be permitted as shown until enrollment reaches 285. <br />students and/or when the permanent building is constructed. At that time, a <br />permanent access shall be constructed at the Johnson Street alignment with required <br />turn lanes as required by Sherburne County. <br />5. If any additional temporary classrooms are required, the applicant shall apply for an <br />amendment to the Interim Use Permit. <br />6. A wetland buffer of 25 feet apply to all wetlands and a structure setback of 20 feet <br />from the buffer applies. <br />7, A NPDES permit is required prior to construction. <br />8. A letter of credit in the amount of 100% of the cost of the landscape, site stabilization <br />improvements, t®a maximum of $50,000 shall be submitted prior to the releasing of <br />the Building permit. <br />9. The Interim Use Permit shall expire on July 1, 2010, <br />Background/Discussion <br />In July 2007, the applicant received an Interim Use Permit (IUP), CU 07-13, to install a temporary class <br />room. Spectrum plans a permanent building on the site, but must first reach a student population of 285 <br />to be elgible for additional funding. The 285 represents no change from the original proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.