My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 01-13-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
01/13/2003
>
6.2. SR 01-13-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:10 AM
Creation date
1/10/2003 9:59:28 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and sidewalks. The residents were assured that every effort would be made to minimize <br />tree removals. A walk through will be scheduled with the residents prior to construction. <br />Appendix C describes the informational hearing in more detail including minutes, <br />mailing list, signup sheet, and handout material. <br /> <br />IX. ESTIMATED PROJECT COST <br /> <br />The estimated construction costs and associated overhead costs for the proposed <br />improvements are Summarized in Table 1. Based on past experiences on similar <br />complex-type projects in the City, the overhead costs have been estimated at 35% of the <br />total construction cost. The overhead costs include city administration, engineering <br />design, construction staking and inspection, and fiscal and legal costs. <br /> <br /> Table 1 <br /> <br />Project Cost Estimate <br /> <br />Street/Drainage <br />Watermain <br /> <br />Total Construction Cost <br /> <br />Administration, Engineering, Fiscal, & Legal <br /> <br />Contingency (5%) <br /> <br />Total Project Cost <br /> <br /> $985,000 <br /> <br /> ~3701000 <br /> <br />$1,355,000 <br />$474,300 <br />$ 68,000 <br />$1,897,300 <br /> <br />X. FINANCING AND ASSESSMENTS <br /> <br />The improvements discussed in this report are proposed to be financed through a <br />number of different methods. Benefiting properties would be assessed on a per unit <br />basis for street, curb and gutter, sidewalks, and storm sewer. A residential lot that could <br />not be further subdivided would be assessed as one unit. Lots that can be subdivided <br />would be assessed as multiple units as appropriate. The Hanke School, library, and <br />churches would be assessed as multiple units determined by the lot area and front <br />footage. The number of assessable units is 92, as shown on Exhibit 8. In accordance <br />with the adopted Pavement Rehabilitation Report, the proposed assessment is <br />$5,000.00 per unit. The total assessment amount would then be $460,000. <br /> <br />The Elk River Municipal Utilities would be responsible for funding all water <br />improvements, including construction cost plus associated overhead. Based on <br />discussions between the City and Municipal Utilities regarding these costs, the estimated <br />total project funding from the Elk River Municipal Utilities is $444,000. <br /> <br />Based on the estimated total project cost of $1,897,300, total assessments of $460,000 <br />and Elk River Municipal Utilities contribution of $444,000, the remaining project cost to <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.