Laserfiche WebLink
Case File: CU OR-OS <br />Page 4 <br />J~ ~g <br />Conditional Usc Perrsuc <br />required to be replaced (mitigated). All but 53,904 square feet were to be mitigated on the subject <br />property. The balance (1.24 acres) is proposed to be mitigated on the adjacent Schuer land bank, <br />not yet created. To guarantee that the mitigation is completed, Staff is recommending a letter of <br />credit in an amount to complete the work and acquire additional property. This amount remains to <br />be determined. <br />Reclamation Plan <br />The reclamation plan as approved in 2004 is not proposed to be changed, and indicates a plan to <br />create a large open water/ wetland complex on the property. The entire eastern 40 acres will be <br />water covered in varying depths, which may impede orderly location of surface roads and general <br />development between 221" and Brook Road. <br />Action Motion by _ Second by _ Vote <br />Follow Up <br />