My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 05-19-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
05-19-2008
>
5.5. SR 05-19-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2008 9:27:11 AM
Creation date
5/16/2008 9:24:47 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cave File: CU OS-09 <br />Page 3 <br />Alliance Church <br />Parking and Circulation <br />Access. Access to the church will be via a single new access off of 185`". <br />Parking The parking requirements fox the church axe based on the number of seats <br />Assembly/ churches: 1 parking space per 3 seats. There axe 714 seats in the main auditorium, <br />requiring 238 parking spaces. The site plan shows 247 parking spaces, including 8 handicapped <br />spaces, meeting the requirement. <br />The parking is provided generally on the north and south sides of the building, with adrive-thru <br />drop off area immediately on the west side of the building. There are two parking lot islands <br />throughout the parking lots, which all include over story trees, consistent with the development <br />regulations. The parking lot islands in the teat axe proposed to be exchanged with striped islands, <br />which the Council approved in 2006. The striping may not be characteristic of the Councils recent <br />goal of improving image throughout the City. <br />No detail is provided for parking lot lighting. Staff would recommend a condition be imposed that a <br />photometric plan be provided to verify that no light will spill into adjacent residential properties, <br />that the lights do not exceed 30 feet and the lights be of a shoebox design to minimize impact on <br />adjacent properties. <br />Landscaoin <br />Sheet A1.2 includes the landscaping plan fox the proposed church. The plan calls fox the addition of <br />22 ovexstory trees, 11 ornamental trees, and 11 evergreen trees. The number of trees is consistent <br />with the landscaping requirements. <br />Staff supports the landscaping as proposed. <br />Grading,. Drainage and Utilities <br />Storm water. Storm water will be distributed to the storm water pond on the north side of the north <br />parking lot via two methods. Storm water falling on the east side of the church will be collected in a <br />series of catch basins in the eastern drive and piped to the storm water pond. All other water will <br />sheet flow to the pond. The northern edge of the parking lot does not show a concrete curb. Staff <br />would recommend a concrete edge. This will define the edge of the pavement, while allowing water <br />to continue to flow over the edge without concentration. <br />The proposed ball field will serve as a secondary storm water pond, to be used during back to back <br />100 year precipitation events. <br />Water. Water supply will be extended from the east in two locations; from 186' Avenue via the <br />Itivexplace development. This line will extend along the future road and connect to a line being <br />extended from 185"' Avenue. The domestic service will be provided from this line. Fire hydrants <br />will be provided near the NW corner of the building, and at the SW comer of the site. <br />S:\YLANNING MAIN\Case Files\CUP\CU OB-09 Alliance Church\Smff Report to PC 5-13-OB.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.