My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 05-19-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
05-19-2008
>
5.5. SR 05-19-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2008 9:27:11 AM
Creation date
5/16/2008 9:24:47 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ilk <br />River <br />City of Elk River Item Number <br />REQUEST FOR PLANNING COMMISION 5.5 <br />ACTION <br />Agenda Section Meeting Date Prepared by <br />Plannin Items Ma 13, 2008 exem Bamhaxt, Plannin Mana r <br />Item Description Reviewed by <br />Request by Kinghom Construction to allow church in Rlb <br />zoning district (Alliance Community Church) Public heating <br />case# CU08-09 <br />Action Requested <br />Staff recommends that the Planning Commission recommend approval of the Conditional Use permit <br />and improvements outlined in plans dated July 31, 2006 with the following conditions: <br />1. A letter of credit in the amount of $50,000 shall be provided as a guarantee for the <br />completion of the site improvements. <br />2. Fire department comments shall be addressed. <br />3. The applicant shall complete Soil correction as per Rebecca Haug, City <br />Environmental Administrator's memo dated August 3, 2006. <br />4. Lighting Plan shall be provided ,including: <br />a. Photometric plan be prepared to verify no light spilling at ground level onto <br />adjacent properties <br />b. Light level be no more than 1 foot candle <br />c. Lights be of a shoebox design and no more than 30 feet above grade. <br />Introduction <br />The applicant desires to develop the property and construct an approximately 33,000 square foot thatch <br />on the pxoperiy. <br />Attachments <br />• Location Map <br />• Staff comment letter dated Apri114, 2008 <br />Memo from Fixe Chief dated April 9, 2008 <br />Applicant narrative dated March 31, 2008 <br />Site Plans dated May 2, 2008 <br />Elevation drawings May 2, 2008 <br />S:\PLANNING MAIN\case Files\CUP\CU OS-09 Alliance Church\Staff Report to PC 5-03-0S.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.